Ryan River Hydro Project
Ryan River Generation Station is located 18 km north of the town of Pemberton, British Columbia.
The project is 145 MW run-of-river hydroelectric development which is located near the base of the Pemberton Icefields.
This project benefits from a stable and well understood hydrological regime and has an unusually small environmental footprint.
Once complete, Ryan River Generation Station will be using a 10 Km long tunnel to connect the headpond the powerhouse with turbines configured to optimize generation throughout the year.
The permitting for Ryan River project is in progress.
Specifications
- Capacity 145 MW
- Located near Pemberton, B.C.
- 426 m of hydraulic head,
- 10 km tunnel
- Project is being developed under a joint venture with the Summit Power Group
- 26.5 Km new transmission line